This is construction photos Series #1A:  Rough framing and some drywalls are in place, as well as all the ceiling.  The stainless steel finish on the main ceiling/ display feature is also installed and the glass partitions for the manager's offices and design department would be installed soon.  Prep for flooring installation is finished and all electrical wiring are done. (Updated 07-05-03)