BACK TO MAIN PAGE  back to commercial design       back to TB construction update #1A          

 

   
                 

                                             

 

              

 

This is construction photos Series #1B:  President office's white glass partition haven't been installed and the stock room sliding door's framing are about to be finished. The extensive ceiling wing atop the General office area and the sloped portion is still being framed. The weight of the the metal ceiling/ wing is being attached to the deck of the main structure of this high rise. (Updated 07-05-03)

Click  for photo series #1A and #2A

to two brushes office design development To Two Brushes construction Photos 2A
To Daigrams and Drawings
to main manu